MCSD Home         Mr. H-Homepage

 Crazy Elmers
 81-Team-'05
 IndianValleyHigh
 IndianValleyMiddle
 IVMS TSA
 IV Warriors.com
 M.C. CAL RIPKEN
 M.C. Pony League
 Mr. Korona
 PaFootballNews
 PA TSA
 PIAA
 Projects
 Schedule
 Sports
 Web Quest

Project for 2004/2005
FIRST & THIRD MARKING PERIODS
8th Grade : MECHANICAL DRAWING
  Plate #1 - 90/60/45/30/Box (Horz. Lines/Vert. Lines/60 Lines - Top 3 boxes)
                                                            (45 Lines/30 Lines/Horz. Lines & Vert. Lines, Boxed w 2h)
  Plate #2 - Drawing #27 & #29 (3-View Drawing)
  Plate #3 - Bridge Drawing (3" x 3" x 8") (3" Bridge Height)(3" Bridge Thickness)(8" Bridge Length)
                                                                                    (1/8" x 1/8" Building Material - Balsa Wood - Glued)
            
#4 - Build a Bridge (3" x 3" x 8")  20' of 1/8" x 1/8" Balsa Wood Structure

  Plate #5 - Drawing #21 & #34 (Isometric Drawing)
 
Plate #6 - Architectural Drawing Maximum Floor Size 8 1/2' x 15" (Floor / House Plans)
EXTRA CREDIT:
 
Plate # 7 - Drawing #34 & #36 (3 - View Drawings)
    Plate #8 - Drawings #23 & #25 (Isometric Drawings)
 

SECOND & FOURTH MARKING PERIODS
7th Grade : INDUSTRIAL MATERIALS - Leather & Plastic
  Leather Project - Key Fob
  Leather Project - Wristband
    Plastic Project - Acrylic Key Chain
    Plastic Project - Injection Molding
    Plastic Project - Pour Molding

EXTRA CREDIT:
 
Leather Project - Coaster or Bookmark
    Plastic Project - Injection Molding (screw driver)
            
                                                                                                                                                           Home Page